AV System Installation Checklist

  1. Check the shop drawing is approved.
  2. Check the method statement is approved.
  3. Check the materials are approved.
  4. Check the material types & sizes are correct.
  5. Check the materials comply with specifications and codes.
  6. Check the field equipment are installed properly as per approved shop drawings.
  7. Check tagging and labeling are done as per project specifications.
  8. Termination of the field equipment are done as per wiring diagram of the manufacturer.
  9. Racks are installed as per approved shop drawings.
  10. Check that there are no missing/damaged parts on the installation.
  11. System is ready for pre-testing.