- Check the shop drawing is approved.
- Check the method statement is approved.
- Check the materials are approved.
- Check the material types & sizes are correct.
- Check the materials comply with specifications and codes.
- Equipment location is in accordance with the shop drawings, specifications, and local codes.
- Check fire‐stop assemblies penetrate fire‐rated elements.
- Check proper phasing, connection, and closure of bus‐assembly terminations to equipment enclosure.
- Check bus‐assembly joints/connections.
- Check support for independent plug‐in units.
- Check that the hangers are installed at correct points of site.
- Check all busbar system visually to be certain that they are clean and
secure. - Check busbar insulation test, test Voltage should be 1000V.
- Check that there are no missing/damaged parts in the installations.