- Check the shop drawing is approved.
- Check the method statement is approved.
- Check the materials are approved.
- Check the material types & sizes are correct.
- Check the materials comply with specifications and codes.
- Check the field equipment (camera, housing, card reader, magnetic lock, exit button, and break glass unit) are installed properly as per approved shop drawings.
- Check the pole mount of the cameras are installed properly.
- Check the tagging and labeling are done as per project specifications.
- Termination of field equipment are done as per wiring diagram of the manufacturer.
- CCTV panels are installed as per approved shop drawings.
- Terminations of CCTV panels are done as per wiring diagram of the manufacturer.
- Check that there are no missing/damaged parts on the installation.
- System is ready for pre-testing.