- Check the shop drawing is approved.
- Check the method statement is approved.
- Check the materials are approved.
- Check the material types & sizes are correct.
- Check the materials comply with specifications and codes.
- Check the supplier and manufacturer is approved.
- Check tagging and labeling are done as per project specifications.
- Termination of the field equipment are done as per the manufacturer.
- Check that there are no missing/damaged parts on the installation.