- Check if there is any factory punch list for the transformer.
- Check the transformer type and rating.
- Check the equipment visually.
- Check if the transformer is clean and free from dust or debris.
- Check the tapping position.
- Check any protection cover.
- Check transformer wheel installation.
- Check all lugs are properly crimped and bolted.
- Necessary tagging and labeling are done as per project specifications.
- Check the transformer installation location.
- Check the dry type distribution transformer layout properly coordinated with other building services.
- Check that there are no missing/damaged parts in the installations.
keywords: checklist, transformer, stadium project, electrical

How Can We Improve This Post?