- Check the drawing status is for construction.
- Check the shop drawing is approved.
- Check the installed material is approved.
- Trenches are ready for conduit installation.
- Conduits are free from dirt and foreign objects prior to installation.
- Correct size of conduits and fittings installed as per drawing.
- Conduits installed as per related drawings and specifications.
- Conduits’ upper height is in line with tray height.
- Conduits’ lower height is in line with socket/switch height.
- No flattening observed at conduit ends.
- All fittings Installed.
- Steel conduit boxes installed correctly according to the drawings.
- All connection pieces installed as per specifications.
- Flexible conduits installed where required.
- Earthling jumpers installed at union and coupling points as per vendor data.
- Release for cable/wire pulling.
- Embedded boxes installed correctly according to the drawings and specifications.
- Check the reservations are in the correct location.
- Check the numbers of reservations are enough.
- Check the sizes of reservations are enough.
- Check the necessary sleeves placed in correct location.
- Check the necessary sleeves are enough quantity and size.