- Check name plate, labelling, ID tags and warning signs correct to drawings / data sheets.
- Confirm no mechanical damage including paintwork.
- Verify earthing / bonding meets project specification.
- Check terminations are secure and correct to design documentation.
- Check general installation quality and cleanliness.
- Confirm grease and gaskets are correctly installed as required.
- Confirm all shipping stops / transport packing removed.
- Confirm spare cable entries are correctly sealed.
- Installation drawings have been “Red Lined” as per the Project Completions Procedure.