- Check LV switchboard types and locations.
- Check the busbar connection between cubicles.
- Check the frame connections at the transport divisions.
- Check the floor fixing to foundation.
- Check condition of enclosure/outside paint.
- Check nameplates of switchboards.
- Check rating of the switchgear components (circuit breakers, current transformers, capacitors, reactors).
- Check earthing of the panel.
- Check the cleaning of switchgear.
- Check if there is any foreign objects (scrap cables, wires, bolts etc.)
- Check that there are no missing/damaged parts on the installations.