LV Switchgear Installation Checklist

  1. Check LV switchboard types and locations.
  2. Check the busbar connection between cubicles.
  3. Check the frame connections at the transport divisions.
  4. Check the floor fixing to foundation.
  5. Check condition of enclosure/outside paint.
  6. Check nameplates of switchboards.
  7. Check rating of the switchgear components (circuit breakers, current transformers, capacitors, reactors).
  8. Check earthing of the panel.
  9. Check the cleaning of switchgear.
  10. Check if there is any foreign objects (scrap cables, wires, bolts etc.)
  11. Check that there are no missing/damaged parts on the installations.

keywords: checklist, LV switchgear, stadium project, electrical