- Check the types and ratings of the MV switchgear, including all components.
- Visually inspect the equipment for any issues.
- Ensure the MV switchgear is clean and free from dust.
- Check if any protective covers are in place.
- Remove any foreign objects like scrap cables, wires, bolts etc.
- Verify the earthing connection for the switchgear.
- Confirm the main busbar connection in the switchgear.
- Check the labels.
- Verify the installation location according to the room layouts.
- Ensure there are no missing or damaged parts during installation.