- Check the shop drawing is approved.
- Check the method statement is approved.
- Check the materials are approved.
- Check the material types & sizes are correct.
- Check the materials comply with specifications and codes.
- Check the field equipment (speaker, volume control, etc.) are properly installed as per approved shop drawings.
- Check tagging and labeling are done as per project specifications.
- Termination of the field equipment are done as per wiring diagram of the manufacturer.
- Racks are installed as per approved shop drawings.
- Termination of PA racks are done as per wiring diagram of the manufacturer.
- Check all lugs are properly crimped and bolted.
- Necessary tagging and labeling are done as per project specifications.
- Check that there are no missing/damaged parts on the installations.
- System is ready for pre-testing.